Amber Stromberg

Kiefer USA is a leading athletic surface design and sports flooring installation company. Amber Stromberg is a Director of Marketing. 10 Years with Kiefer. Favorite Hobby: working out and spending time with her kids and family.

augustana college gym flooring

Kiefer Completes Wood Floor at the Carver Center at Augustana College

The Carver Center is back and better than ever! Kiefer USA installed all new Connor Wood Flooring in the Carver Center at Augustana College in August of this year. Watch the time lapse video of the install. Amber StrombergKiefer USA is a leading athletic surface design and sports flooring installation company. Amber Stromberg is a

Kiefer Completes Wood Floor at the Carver Center at Augustana College Read More »

rockridge high school

What to Do If a Sports Floor Is Damaged by Flooding

Sports facilities make no exception – floodwaters can be devastating to school gymnasiums, field houses, athletic arenas, and other sports centers. Even a relatively small amount of water from broken pipes, malfunctioning sprinklers, or leaky roofs can cause severe water damage to a sports floor, but flooding is sure to warrant extensive repairs or replacement. So, what should school administrators and facility owners do if their sports floors get flooded? How can they get their facilities back up and running shortly after the disaster?

What to Do If a Sports Floor Is Damaged by Flooding Read More »

hy vee arena indoor track

Renovated Hy-Vee Arena will feature Mondo Super X 720 and Mondo Ramflex Flooring

Set to reopen for youth and adult sports in September, venue will be home to largest indoor track in continental U.S. It once was home to NBA and NHL teams, and it has hosted an NCAA Final Four and a Republican National Convention. But in September, the venue formerly known as Kemper Arena will reopen

Renovated Hy-Vee Arena will feature Mondo Super X 720 and Mondo Ramflex Flooring Read More »

minnesota vikings tco performance center

Turf Installed at the New Vikings Indoor Practice Facility

At the end of February the final pieces of turf were installed at TCO Performance Center’s indoor practice facility to complete the construction of the nearly 91,000 square-foot building. Kiefer USA installed Turf Nation’s S5 over a 23mm pad, which is the same surface that is installed at the U.S. Bank Stadium. On Friday June 22.

Turf Installed at the New Vikings Indoor Practice Facility Read More »

Scroll to Top
Contact Us